Inside The Civic This Week: A big lift for The Civic
Spotted a big crane outside The Civic Theatre last week? New rooftop equipment is now in place, while crews continue electrical, plumbing and drywall work inside. Here’s the latest on our community cinema’s renewal.
If you passed The Civic Theatre last week, you may have spotted a large crane outside the building. It was there for an important delivery: new heating and ventilation equipment for our renewed community cinema.
The equipment was safely lifted into place on November 18, and installation has begun. While much of the renovation is happening out of sight, this was a visible sign of the work underway to bring The Civic back.
Inside, crews are continuing electrical wiring, plumbing, wall framing, raised-floor platforms and drywall. There has been continued progress throughout the lobby and theatre, including the washrooms, corridors and staff area.
Ductwork installation continues in the attic, with some routes being adjusted in coordination with the design team. Structural steel work is also progressing in the elevator area, where central columns and a lifting beam remain to be installed.
Much of this work will eventually be hidden behind walls and ceilings, but it is essential to creating a comfortable, accessible and functional place to experience film together.
Thank you to the crews, consultants and project partners working through the many details of this renovation, and to everyone in our community who continues to support NCTS. Each stage brings the renewed Civic closer to becoming a place where we can gather at the movies again.
Top photo: Devon Caron
All other photos: Chandos Construction
Tagged Capital Update